Wisconsin DOT Seeking Public Comment on Proposed Improvement Project Replacing Bridge in Loyal; Comments Due Next Monday
Monday, February 17th, 2025 -- 2:01 PM

The Wisconsin Department of Transportation (WisDOT) is seeking public comment on a proposed improvement project replacing the bridge that carries WIS 98 over Bear Creek in the Clark County city of Loyal.
The public is encouraged to visit the project website, review a handout, maps and other information. Comments are being accepted through Feb. 24 by:
Email: [email protected]
Mail: Wisconsin Department of Transportation
718 W. Clairemont Ave..
Eau Claire, WI 54701
Attn.: Christena O’Brien
Built in 1920, the bridge is nearing the end of its surface life. WisDOT is proposing to:
- Remove the existing bridge.
- Construct a new single-span concrete girder bridge with sidewalks from WIS 98/County K to the east end of the bridge.
- Reconstruct approach pavement on both sides of the structure to accommodate drainage and provide a smooth ride onto the new bridge.
- Remove existing guardrail.
Construction is currently scheduled for 2027. During construction, WIS 98 will be closed, and through traffic will be detoured via WIS 73, County H and County Y.
Feel free to contact us with questions and/or comments.